Thursday, May 10, 2018

week 15 spring 2018

This is the last week of this whole project. Many things need to be done. Our project is facing a big challenge than ever. Right now, we have two top structures welded. We get a lot help on both material and labor support from solar team. With their help, we can connect the two top structures together.
Few other things need to be done are:
1. find screws that can fix the motor in place. The screws we bought can only go half way into the motor
2. buy the column that can set the stabilization wheels in place.
3. get as many parts as possible from vendors